86365-11-photo.tif

The three top photos show the construction of the piers on the far side of Bear Creek and installing the main cables. The lower left photo show the main cables in place on the near side of Bear Creek. The other three photos show CCC boys placing hooks on the upper and lower cables that will later be used to lace the cables. The working platform could be moved horizontally and vertically by pulleys - pretty risky.


Collection Description General & Tech Data Catalog Record

Details


  • Item: 12
  • Description:

    The three top photos show the construction of the piers on the far side of Bear Creek and installing the main cables. The lower left photo show the main cables in place on the near side of Bear Creek. The other three photos show CCC boys placing hooks on the upper and lower cables that will later be used to lace the cables. The working platform could be moved horizontally and vertically by pulleys - pretty risky.

  • County: Tishomingo County
  • State: Mississippi
  • Call Number: PI/1997.0003
  • Filename: 86365-11-photo.tif